CUET PG 2026 — operating system os PYQ
CUET PG | operating system os | 2026Performance Metric Goals
List-I (Scheduling Metric)
A. CPU Utilization
B. Throughput
C. Turnaround Time
D. Waiting Time
List-II (Ideal Optimization Direction)
Maximize (Keep CPU as busy as possible)
Maximize (Number of completed processes per time unit)
Minimize (Total time from submission to completion)
Minimize (Total time spent sitting in the ready queue)
